Cover Build Method
A typical construction method that allows for rebuilding while operating! The roof and exterior walls are installed first.
The "Cover Build Method" is one of the representative construction methods of Yoshizawa Architectural Structural Design, made possible by precise structural calculations, allowing for "reconstruction while in operation." Machines and equipment within the factory that cannot be moved are left in their original state, and steel frames are assembled to cover the existing factory, with the roof and exterior walls installed first. After ensuring that rain and wind do not enter, the existing buildings within the new structure are gradually dismantled while the reconstruction proceeds. [Features] ■ Made possible by precise structural calculations ■ New buildings are constructed to cover existing ones ■ Machines and equipment within the factory that cannot be moved are left in their original state *For more details, please refer to the PDF materials or feel free to contact us.
- Company:ヨシザワ建築構造設計
- Price:Other